Roofing Siding Decks Patios Fencing Repairs
About Tropical Experience

Calgary Decks

90 days of summer.
One deck for all of them.

Free assessment. Kevin checks your space, your soil, your frost depth. You get a real plan — not a brochure.

GL Frost line — 48" Calgary avg. Footing Footing Post Post Beam Joists — 16" o.c. Decking surface Railing Deck height Deck width

↑ Hover each layer

Pressure-treated pine

Why trust that
5.0★Google rating — +500 happy clients
48"Calgary frost depth — every footing goes deeper
25yrTrex/TimberTech composite fade & stain warranty
7yrWorkmanship warranty on every TD build
What's included

Every deck. Every time.

Kevin builds it once, builds it right. These aren't upsells — they're the baseline.

01Frost footings
Below 48" — past where Calgary ground freezes. This is why decks don't shift.
02Permit handling
Filed with the City of Calgary. Managed start to finish. You don't touch it.
03Code-compliant railing
36" or 42" depending on height. Matches your material choice.
04Written scope
Every detail in writing before a single board goes down.
05Site cleanup
We leave your yard cleaner than we found it.
06Final inspection
Signed off by Kevin personally before we call it done.
077yr warranty
Workmanship. No fine print. If something moves, we fix it.
Ballpark estimate — live

Pick your size. Watch the number.

Estimate accuracy: rough

01How big is your deck?

200sq ft
Under 150 sq ft 150–300 sq ft 300–500 sq ft 500+ sq ft

02How high off the ground?

03Preferred material?

Pressure-treated: lowest upfront, stain every 2–3 years

Rough estimate — Calgary 2025

Materials + labour

Upper range

Select your options above to see an estimate

Free. Either way.

Site photos

Kevin documents your space. Yours to keep.

Written scope

Every detail in writing. No surprises.

Priority scheduling

Assessed first means booked first.

Questions people actually ask.

Yes — any deck over 24 inches off the ground requires a permit from the City of Calgary. TD handles the full permit process for you. We file it, manage the inspection schedule, and make sure everything is signed off before you use the deck.
Calgary's frost depth averages 48 inches. Footings that don't go below the frost line will heave and shift every spring as the ground freezes and thaws. That moves your posts, which moves your frame, which moves your deck surface — boards gap, railings loosen, stairs shift. Every TD footing is poured below frost line. Non-negotiable.
Pressure-treated costs less upfront but needs staining or sealing every 2–3 years, and will eventually crack and grey. Composite (Trex/TimberTech) costs more initially but carries a 25-year fade and stain warranty, never needs sealing, and looks the same in year 20 as year 1. Over a 10-year window, composite is usually cheaper when you factor in maintenance. Kevin will walk you through the real numbers for your specific deck.
A straightforward ground-level deck takes 2–4 days once materials are on-site. Elevated or multi-level builds run 4–7 days. Permit approval from the City of Calgary typically takes 1–3 weeks, which is the main scheduling factor. We build that timeline into your project plan from day one.
May through September is ideal — ground is thawed, concrete cures properly, and you get to actually use it the same season. That said, we book early spring slots fast. If you're thinking about a deck this summer, now is the right time to get assessed.

90 days of summer.
One deck for all of them.

Free assessment. No pressure. If the timing isn't right, we'll tell you that too.